Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Piping Design
Piping Design
Quick Usage Guides
Quick Usage Guides
Design Of Straight & Spiral Staricase
Design Of Straight & Spiral Staricase
Modelling & Library Creation
Modelling & Library Creation
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Ev Charging Station Design
Ev Charging Station Design
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design