Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel

We assisted in converting a non-pressurized mixing barrel into a pressure vessel while ensuring compliance with PED standards. Using ANSYS 2020R1, the project involved finite element modeling, stress analysis, and deformation evaluation. The analysis confirmed maximum deformations of 0.16mm (test pressure) and 0.08mm (working pressure), with Von-Mises stresses within.

Other Case Studies

Value Engineering & Product Localisation – Welding Equipment
Value Engineering & Product Localisation – Welding Equipment
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Offshore Development Centre Built Through A Mix Model
Offshore Development Centre Built Through A Mix Model
PCB Design & Localization For An Automated Welding Equipment
PCB Design & Localization For An Automated Welding Equipment
Platform Integration For A Metro Operator For Metropolitan Cities
Platform Integration For A Metro Operator For Metropolitan Cities
Hydrogen Refuelling Station Design
Hydrogen Refuelling Station Design
Technical Documentation for Manufacturing & Factory Automation
Technical Documentation for Manufacturing & Factory Automation
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
Design Automation / New Variant Creation – Press Systems Equipment (Glue Blender)
One Grob EV station design
One Grob EV station design
Gantry Layout for Crankshaft Machining Line
Gantry Layout for Crankshaft Machining Line