Project Control Forensic Delay Analysis For An Australian Metro

Project Control Forensic Delay Analysis For An Australian Metro

A leading Australian metro undertook a major expansion project for southwest line facing delays in regulatory approvals, threatening the project’s overall timeline.

We at Tooltech, supported them in their cost savings vision using – Forensic delay Analysis. The Impact was,
• Early Identification of potential regulatory delays at the project initiation phase.
Proactive Measures to enhance swift communication and collaboration with regulatory bodies. This led to a 20% reduction in approval delays. This avoided significant cost overruns.

Estimated Cost Savings: $2 million

Other Case Studies

New Product Development – Metal Industry
New Product Development – Metal Industry
Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
Conversion Of Non – Pressurised Mixing Barrel Into A Pressure Vessel
3D Web Library Creation
3D Web Library Creation
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates
One Grob EV station design
One Grob EV station design
Electrical Design Optimization And Localisation
Electrical Design Optimization And Localisation
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
Quick Usage Guides
Quick Usage Guides