Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

A leading transportation and infrastructure company in Australia approached Tooltech to provide services for Project Planning and Control and Forensic Delay analysis.

We developed a comprehensive schedule that outlines the sequence of activities, dependencies, and timelines for each task within the program while monitoring the progress of the project against the established schedule and budget and prepare various dashboards.

In addition, we analyzed any variances between planned and actual performance to identify areas where corrective action may be required. And the critical path of the project to understand how delays affect the overall timeline.

Some other tasks were as below:

  • Quantified the impact of delays on the project schedule and cost.
  • Prepared upstream claims for EoT and review the claims submitted by contractor.

Prepared and monitored budget of the project and generated required reports

Other Case Studies

Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
Conversion Of An Existing Non-Pressurised Vessel To A Pressure Vessel As Per Ped Standards
In-Stage Quality Inspection For Metro Train Manufacturing
In-Stage Quality Inspection For Metro Train Manufacturing
Technical Documentation for Manufacturing & Factory Automation
Technical Documentation for Manufacturing & Factory Automation
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
Design of EV charging stations
Design of EV charging stations
E-mobility Manufacturing
E-mobility Manufacturing
E-Mobility Station Design
E-Mobility Station Design
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Simulation Global Competency Centre Built For One Of Germany’s Big Three
Application Development & New Product Development For Shipment Measurement System
Application Development & New Product Development For Shipment Measurement System
Gantry Layout for Crankshaft Machining Line
Gantry Layout for Crankshaft Machining Line