Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

A leading transportation and infrastructure company in Australia approached Tooltech to provide services for Project Planning and Control and Forensic Delay analysis.

We developed a comprehensive schedule that outlines the sequence of activities, dependencies, and timelines for each task within the program while monitoring the progress of the project against the established schedule and budget and prepare various dashboards.

In addition, we analyzed any variances between planned and actual performance to identify areas where corrective action may be required. And the critical path of the project to understand how delays affect the overall timeline.

Some other tasks were as below:

  • Quantified the impact of delays on the project schedule and cost.
  • Prepared upstream claims for EoT and review the claims submitted by contractor.

Prepared and monitored budget of the project and generated required reports

Other Case Studies

3D Web Library Creation
3D Web Library Creation
Value Engineering & Product Localisation – Welding Equipment
Value Engineering & Product Localisation – Welding Equipment
Press Tool Design for Heat Exchanger Plates
Press Tool Design for Heat Exchanger Plates
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Reverse Engineering & Product Improvisation Of A Skid Steer Loader
Powertrain Manufacturing Plant Commissioning
Powertrain Manufacturing Plant Commissioning
Simulation team for BMW
Simulation team for BMW
Piping Design
Piping Design
SAP Master Data Management & Procurement Support
SAP Master Data Management & Procurement Support
Screw Conveyor Design
Screw Conveyor Design
Project Control Forensic Delay Analysis For An Australian Metro
Project Control Forensic Delay Analysis For An Australian Metro