Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

Project Planning & Control And Forensic Delay Analysis For The Sydney Metro Project

A leading transportation and infrastructure company in Australia approached Tooltech to provide services for Project Planning and Control and Forensic Delay analysis.

We developed a comprehensive schedule that outlines the sequence of activities, dependencies, and timelines for each task within the program while monitoring the progress of the project against the established schedule and budget and prepare various dashboards.

In addition, we analyzed any variances between planned and actual performance to identify areas where corrective action may be required. And the critical path of the project to understand how delays affect the overall timeline.

Some other tasks were as below:

  • Quantified the impact of delays on the project schedule and cost.
  • Prepared upstream claims for EoT and review the claims submitted by contractor.

Prepared and monitored budget of the project and generated required reports

Other Case Studies

Floating Villa Design
Floating Villa Design
New Product Development – Metal Industry
New Product Development – Metal Industry
Operations & Maintenance Assessment For A Metro Major
Operations & Maintenance Assessment For A Metro Major
One Grob EV station design
One Grob EV station design
Commissioning For Industry 4.0 Powertrain Factory
Commissioning For Industry 4.0 Powertrain Factory
Robotic BIW Fixture Design & Detailing
Robotic BIW Fixture Design & Detailing
Inspection & Supervision Support For Lng Tank Fabrication
Inspection & Supervision Support For Lng Tank Fabrication
E-Mobility Station Design
E-Mobility Station Design
Quick Usage Guides
Quick Usage Guides
Value Engineering & Product Localisation – Welding Equipment
Value Engineering & Product Localisation – Welding Equipment